Saturday, March 6, 2010

Kitchen Remodel Day 2


Kitchen Remodel Day 2
Originally uploaded by thyme2003
The floor is almost covered in tiles. Still the entry way and 2 closets outside the picture frame to the left to go. Laying the tiles is only the first part. Then you have to grout them and the grout has to dry. Could take a few days.


No comments: